Topside induced accelerations monitoring systems (TIAMS)

During 2004-2006 the deparment of measurement system of IEG RAS has developed the "Topside induced accelerations monitoring systems (TIAMS)"
for oil platforms in the project Sakhalin-2. The customer of contract is Sakhalin Energy.

On January 2006 TIAMS for LUN-A platform has successfully passed the fabric acception tests and was transferred to Korea for the installation at the platform.

On June 2006 TIAMS for PA-B platform has successfully passed the fabric acception tests too and was transferred to the customer.

Photo: The LUN-A platform on its way to the working place. The insert: one of TIAMS remote measurement units installed at the LUN-A platform.

The final speech of Eric Holdstock (Sakhalin Energy) that was written and pronounced in Russian may be seen here (russianenglish).